Stahllion LLC is Eric Stahl, P.E., a licensed professional engineer who takes septic projects from the first site review to an approved permit in Montana mainly in Yellowstone, Stillwater, Carbon, Musselshell and Sweet Grass Counties. Get a written estimate up front, and the complete county or DEQ application package, including the engineering report, drawings and joint application, is prepared and submitted for you. County and DEQ review fees are listed separately so there are no surprises.
Every system is sized to your proposed system flowrate, soils and site and drawn to Montana DEQ Circular DEQ-4: allowed designs. The drawing set covers the site layout, trench and tank details and construction notes your installer builds from, and the design is kept as simple and economical as the site allows. Upgrades for added bedrooms, replacement homes and failing drainfields are designed the same way.

Many Montana lots carry sanitary restrictions until DEQ approves water and wastewater for them. Stahllion prepares the DEQ subdivision application to lift those restrictions, along with boundary relocations and certificate of subdivision approval (COSA) rewrites, and handles the nondegradation analysis (nitrate mixing zone and phosphorus breakthrough) that comes with them.
Every design starts with the soil. A test pit is dug within 25 feet of the proposed drainfield, each horizon is logged and classified, and a signed soils report sets the application rate. Sites near creeks, rivers or irrigation get a monitoring well read through the spring and summer high-water season as necessary.
It depends on the county and the project. DEQ subdivision reviews, pressure-dosed systems, sand mounds and sites with high groundwater generally need an engineered design. Even where it isn't required, a complete engineered package tends to move through review with fewer delays and/or questions.
Timeframes vary depending on current workload and the specifics of each property, so every project is estimated individually as it is reviewed. Sites that need groundwater monitoring have to be watched through the spring and summer high-water season before the application can be submitted, so call early if your lot is near a creek, river, irrigation or general high water.
A test pit is an excavation, usually about 8 feet deep, near the proposed drainfield. The soil layers are logged and classified to set the application rate and to find any limiting layer such as poor soils, groundwater, or bedrock. The county uses the soils report to confirm the design fits the site.
Many lots in Montana carry sanitary restrictions until DEQ approves water and wastewater for them. Lifting the restrictions is a DEQ subdivision review showing the lot can support a septic system, a water supply and the required rules and setbacks.
It depends on the system type and what the site needs, each property is unique and may require differing analysis. You receive a written estimate before any work begins. County and DEQ review fees are paid separately to the agency.
Tanks and drainfields are sized by flowrate. Added bedrooms or business needs often mean a larger system or a permit update. Your existing permit and system can be reviewed and the options laid out before you build.
406-861-8005
Eric Stahl, P.E. - based in Park City, MT, serving Yellowstone, Stillwater, Carbon, Musselshell and Sweet Grass Counties.
Have the property location, county and planned number of bedrooms handy.
Mon | 08:00 am – 05:00 pm | |
Tue | 08:00 am – 05:00 pm | |
Wed | 08:00 am – 05:00 pm | |
Thu | 08:00 am – 05:00 pm | |
Fri | 08:00 am – 05:00 pm | |
Sat | Closed | |
Sun | Closed |
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.